Periode 18-Aug-2026 – 21-Aug-2026 · 195 entri · 4 hari kerja. Sumber: LinkIT360 Priority Tracker + OTT Daily Update Log.
95 dari 195 task selesai. Target harian 75% — gap 26.3 poin.
ATTENTIONKolom Planned/Actual Hrs, AI Assisted, AI Tool, Tokens Used, AI Contribution %, QA Status, dan Rework belum terisi di source. Kosong berarti belum ditangkap — bukan bernilai nol.
Periode 18-Aug-2026 – 21-Aug-2026 · 4 hari kerja. Panjang bar = jumlah task hari itu.
Bar kiri: komposisi status task pada periode ini. Meter kanan: progress keseluruhan produk menurut tracker.
Cross-stream ditandai — orang yang muncul di kedua source, indikator resource contention.
1 = orang tersebut punya entri pada tanggal itu, dihitung otomatis dari StandupLog.
| Nama | Tue 18-Aug | Wed 19-Aug | Thu 20-Aug | Fri 21-Aug | Hari submit |
|---|---|---|---|---|---|
| Syiffa Putri Meillani · BA | 1 | 0 | 0 | 0 | 1/4 · 25% |
| Budi Setio Nugroho · Dev | 1 | 0 | 0 | 0 | 1/4 · 25% |
| Ricky Alexander Tanjaya · BA | 1 | 0 | 0 | 0 | 1/4 · 25% |
| Aldiama Hari Octavian · Dev | 1 | 1 | 1 | 1 | 4/4 · 100% |
| Dimas Fahrul · Dev | 1 | 1 | 1 | 1 | 4/4 · 100% |
| Gilang Permana Putra · Dev | 1 | 1 | 1 | 1 | 4/4 · 100% |
| Ni Komang Dwi Maharani · BA | 1 | 1 | 1 | 1 | 4/4 · 100% |
| Muhammad Luthfi Rahman · Dev | 1 | 1 | 1 | 1 | 4/4 · 100% |
| Hasri Akbar Awal Rozaq · Dev | 1 | 1 | 1 | 1 | 4/4 · 100% |
| Achmad Setiadji Nugroho · Dev | 1 | 1 | 1 | 1 | 4/4 · 100% |
| Indrapati · QA | 1 | 1 | 0 | 1 | 3/4 · 75% |
| Silla · BA | 1 | 0 | 1 | 1 | 3/4 · 75% |
| Muhammad Affan Ilhamsyah · BA | 1 | 1 | 1 | 1 | 4/4 · 100% |
| Bimo Prakoso Wibowo · BA | 1 | 1 | 1 | 1 | 4/4 · 100% |
| Andhika · QA | 0 | 1 | 1 | 0 | 2/4 · 50% |
| Farhan · Developer | 0 | 0 | 1 | 1 | 2/4 · 50% |
| Yafi · Developer | 0 | 0 | 1 | 1 | 2/4 · 50% |
Rata-rata umur 8.6 hari. 3 bersumber dari infra/environment; 1 sudah resolved dan tidak dihitung.
Produk priority score 77 (rank 3) dengan 31 task minggu ini tertahan. Risiko slip komitmen delivery e-Gov.
Mobile app adalah deliverable utama e-Gov Smart City. Overall produk stagnan di 65%.
Product is already live on Play Store; Phase 3 is stuck. 2 QA bugs (ABT-670/671) not yet started.
Multi-node rollout & OPS handover delayed; revenue-generating service.
Produk demo-ready (92%) tapi dev tidak bisa mulai iterasi berikutnya.
BA breakdown tidak bisa dilanjutkan; jadwal demo tidak bisa dikunci.
Product idle since before Aug 14. Needs a go/no-go decision so capacity doesn't hang.
Tidak ada satu pun kolom AI usage, token, effort hours, QA status, atau rework di KEDUA source. Akibatnya 8 dari 18 KPI berstatus NO DATA — termasuk AI Hybrid Score. Divisi berlabel AI-Native tetapi tidak mengukur satu pun metrik AI.
4 dari 8 blocker aktif bersumber dari infra/environment (Kimee CMS deploy, Lulladream backend, RusVPN port restriction, CamControl Git repo). Ini pola, bukan kebetulan — perlu SLA provisioning.
Priority rank 3 (score 77) dengan 31 task minggu ini, tidak ada update sejak 11 Agu — 7 hari. Dua blocker P1 (BRD/FSD dan mobile app). Satu-satunya produk yang stall lintas dua siklus laporan.
Aldiama, Dimas Fahrul, dan Gilang Permana Putra aktif di KEDUA stream secara bersamaan. Luthfi Rahman memegang 5 produk OTT sekaligus. Indrapati adalah satu-satunya QA di seluruh portfolio.
Tidak ada atribusi L1–L4 maupun AI-Native pillar di source manapun. Roster diisi 'TBD' — framework maturity divisi belum bisa dijalankan sampai ini di-tag.
Summary OTT menyebut 30 task; row-level detail berisi 31 baris (selisih di Kimee). Workbook memakai row-level sebagai sumber kebenaran.
Aktifkan pengisian kolom Tokens Used dan AI Assisted, idealnya di-import dari platform TAM, bukan diketik manual.
Isi L1–L4 dan re-tag stream ke 4 AI-Native pillar agar governance framework divisi bisa berjalan.
Wajibkan Planned/Actual Hrs. Tanpa ini, Effort Variance dan capacity planning tidak bisa dihitung.
Call dengan Ricky & Dimas untuk ETA firm, atau re-plan scope. Stall 7 hari sudah melewati batas wajar.
Nilai yang dipudarkan belum pernah muncul di data periode ini.
Tujuh tab sumber, buka langsung di Google Sheets:
| Tanggal | Produk | Nama | Role | Ticket | Task | Kategori | Status | Progress |
|---|---|---|---|---|---|---|---|---|
| 18-Aug-2026 | Certificate of Origin (CO) Platform | Syiffa Putri Meillani | BA | BR-50 / BR-87 | CamCO epic oversight — BR-87 Demo Product closed, BR-99 public landing page dibuka | Coordination | In Progress | 100% |
| 18-Aug-2026 | Certificate of Origin (CO) Platform | Budi Setio Nugroho | Dev | BR-99 | Landing page portal for public access (new today, due 21 Agu) | Feature | In Progress | 90% |
| 18-Aug-2026 | ADCE Cambodia | Syiffa Putri Meillani | BA | BR-51 | ADCE epic — BA breakdown & follow-up task | Documentation | In Progress | 100% |
| 18-Aug-2026 | ADCE Cambodia | Aldiama Hari Octavian | Dev | BR-100 | Landing page portal for public (new today, due 21 Agu) | Feature | In Progress | 80% |
| 18-Aug-2026 | eGov Smart City | Ricky Alexander Tanjaya | BA | GOR-226 / GOR-227 | BRD & FSD Documentation — tidak ada update sejak 11 Agu | Documentation | Delay | 55% |
| 18-Aug-2026 | eGov Smart City | Dimas Fahrul | Dev | GOR-246 / GOR-247 | Android & iOS App Implementation — tidak ada update sejak 11 Agu | Feature | Delay | 70% |
| 18-Aug-2026 | EIR / MIRS (Laos & Burkina Faso) | Syiffa Putri Meillani | BA | BR-102 | Simbox report additional features (new today, due 20 Agu) | Feature | In Progress | 90% |
| 18-Aug-2026 | EIR / MIRS (Laos & Burkina Faso) | Gilang Permana Putra | Dev | BR-82 / BR-92 | Add Daily Data & Demo Data Prep | Feature | Done | 100% |
| 18-Aug-2026 | CamControl Inspection | Syiffa Putri Meillani | BA | BR-52 | CamControl epic — menunggu konfirmasi scope final dari Presales | Coordination | Blocked | 70% |
| 18-Aug-2026 | CamControl Inspection | Budi Setio Nugroho | Dev | INFRA-CAMCTRL | Infra ticket: pembuatan Git repo + 3 developer invite (Budi x2, Gilang) | Infra/Ops | Blocked | 50% |
| 18-Aug-2026 | SynapSea | Syiffa Putri Meillani | BA | BR-97 | Review fisherman KTP registration flow | QA/Testing | Done | 100% |
| 18-Aug-2026 | SynapSea | Gilang Permana Putra | Dev | BR-83 / BR-93 | Register flow & Buyer Portal development | Feature | Done | 100% |
| 18-Aug-2026 | FCS — Fiscal Cadastre Service | Syiffa Putri Meillani | BA | BR-101 | Revise doc & design (new today, due 20 Agu) | Documentation | In Progress | 90% |
| 18-Aug-2026 | FCS — Fiscal Cadastre Service | Gilang Permana Putra | Dev | BR-98 | Revise Public portal (new today, due 21 Agu) | Feature | In Progress | 90% |
| 18-Aug-2026 | MoC Expocam (CAM EXPO 2026) | Syiffa Putri Meillani | BA | BR-94 | Booth BRD & material — CAM EXPO 2026 event day | Coordination | Done | 100% |
| 18-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | — | Filed env-adjustment ticket ke tim infra | Infra/Ops | Done | 100% |
| 18-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | — | Game content ditambahkan ke CMS — Island 1-3 partial, Island 5 complete, Island 4 pending | Feature | Done | 100% |
| 18-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | N/A — monitoring/waiting, no ticket needed | Waiting on Naufal's HTML update to finish uploading all games | Support/Escalation | Monitoring | 40% |
| 18-Aug-2026 | Kimee | Hasri Akbar Awal Rozaq | Dev | N/A — meeting/coordination | Meeting to finalize revamp additions | Coordination | Done | 100% |
| 18-Aug-2026 | Kimee | Hasri Akbar Awal Rozaq | Dev | KID-151 | Recommendation path done — syncing & coordinating with R&D to deploy | Feature | In Progress | 50% |
| 18-Aug-2026 | Kimee | Muhammad Luthfi Rahman | Dev | N/A — meeting/coordination | Meeting to finalize revamp additions | Coordination | Done | 100% |
| 18-Aug-2026 | Kimee | Muhammad Luthfi Rahman | Dev | N/A — infra-side issue, no app-level ticket | CMS FE & BE deploy blocked by infra environment issue | Infra/Ops | Blocked | 15% |
| 18-Aug-2026 | Lulladream | Ni Komang Dwi Maharani | BA | N/A — infra ticket filed in a separate Infra project | Filed env-adjustment ticket to the infra team | Infra/Ops | Done | 100% |
| 18-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | N/A — infra-side issue, no app-level ticket | CMS deploy blocked by backend issue | Bug Fix | Blocked | 15% |
| 18-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-670 / ABT-671 | Continuing Phase 3 features (coin economy, sharing, preview) | Feature | In Progress | 50% |
| 18-Aug-2026 | Life Fit | Ni Komang Dwi Maharani | BA | N/A — informal check by BA, no dedicated ticket | Test registration flow on APK (Google SSO & WhatsApp) | QA/Testing | Done | 100% |
| 18-Aug-2026 | Life Fit | Ni Komang Dwi Maharani | BA | N/A — administrative (created ticket(s) in LF project) | Created Jira task for QA testing of registration flow (APK) | Coordination | Done | 100% |
| 18-Aug-2026 | Life Fit | Achmad Setiadji Nugroho | Dev | LF-196 | Waiting on QA sign-off before deploying to production | Support/Escalation | Monitoring | 40% |
| 18-Aug-2026 | Life Fit | Muhammad Luthfi Rahman | Dev | LF-194/LF-195 | Waiting on QA sign-off before deploying to production | Support/Escalation | Monitoring | 40% |
| 18-Aug-2026 | Life Fit | Indrapati | QA | LF-196 | Testing CMS notification menu, Portal update notif, APK registration flow | QA/Testing | In Progress | 50% |
| 18-Aug-2026 | RusVPN | Silla | BA | RVPN-255 | Monitoring agent rollout — waiting on infra team for server setup | Support/Escalation | Monitoring | 40% |
| 18-Aug-2026 | RusVPN | Muhammad Luthfi Rahman | Dev | RVPN-255 | Agent rollout to 5 nodes delayed — blocked by infra port restriction | Infra/Ops | Blocked | 15% |
| 18-Aug-2026 | MinuteX | Dimas Fahrul | Dev | Could not create — no permission on LMA project | Deployed to staging, queued for QA testing (Teams Meeting feature) | Feature | In Progress | 50% |
| 18-Aug-2026 | SpeakEasy | Ni Komang Dwi Maharani | BA | SE-250/ SE-251 | Jira task: Excel upload & Daily Challenge portal edit — assigned to Luthfi | Coordination | Done | 100% |
| 18-Aug-2026 | SpeakEasy | Ni Komang Dwi Maharani | BA | SE-252 | Jira task: find-your-level assessment issue (78 → 9 questions) | Coordination | Done | 100% |
| 18-Aug-2026 | SpeakEasy | Ni Komang Dwi Maharani | BA | SE-253 | Tested Daily Challenge portal edit | QA/Testing | Done | 100% |
| 18-Aug-2026 | SpeakEasy | Ni Komang Dwi Maharani | BA | SE-254 | Tested find-your-level assessment on portal | QA/Testing | Done | 100% |
| 18-Aug-2026 | SpeakEasy | Muhammad Luthfi Rahman | Dev | SE-250 | Fixed Daily Challenge portal edit issue | Bug Fix | Done | 100% |
| 18-Aug-2026 | SpeakEasy | Muhammad Luthfi Rahman | Dev | SE-251 | Updating Excel-upload logic for questions | Feature | In Progress | 50% |
| 18-Aug-2026 | SpeakEasy | Muhammad Luthfi Rahman | Dev | SE-252 | Fixed find-your-level assessment (78 → 9 questions) | Bug Fix | Done | 100% |
| 18-Aug-2026 | RuangRasa | Ni Komang Dwi Maharani | BA | N/A — meeting/coordination | Team meeting scheduled Thu 20 Aug — AI engine integration discussion | Coordination | To Do | 10% |
| 18-Aug-2026 | RuangRasa | Muhammad Affan Ilhamsyah | BA | N/A — meeting/coordination | Team meeting scheduled Thu 20 Aug — AI engine integration discussion | Coordination | To Do | 10% |
| 18-Aug-2026 | Booksnap | Ni Komang Dwi Maharani | BA | BN-533 - BN-541 | Created Jira tasks based on sprint from Keket | Coordination | Done | 100% |
| 18-Aug-2026 | Booksnap | Ni Komang Dwi Maharani | BA | N/A — coordination/documentation, no ticket needed | Shared Figma designs with dev team | Documentation | Done | 100% |
| 18-Aug-2026 | Booksnap | Gilang Permana Putra | Dev | BN-533 - BN-536 | Started new feature per Jira & Figma | Feature | In Progress | 50% |
| 18-Aug-2026 | Fantasy Eleven | Bimo Prakoso Wibowo | BA | N/A — pre-kickoff, no active ticket | No new update — waiting for kickoff, CMS slicing pending | Coordination | Blocked | 15% |
| 19-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | KID-153 | Setting up Stripe account (thin & snapshot) | Infra/Ops | Done | 100% |
| 19-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | KID-155 | Mini game content added to CMS — Islands 1-3 done | Feature | Done | 100% |
| 19-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | N/A — monitoring/waiting, no ticket needed | Island 4 not built yet — waiting on update from Naufal | Support/Escalation | Monitoring | 40% |
| 19-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | N/A — informal confirmation, no ticket needed | TTS generator audio (WAV) confirmed with the game team | Coordination | Done | 100% |
| 19-Aug-2026 | Kimee | Hasri Akbar Awal Rozaq | Dev | KID-156 | 7-day path feature added | Feature | Done | 100% |
| 19-Aug-2026 | Kimee | Hasri Akbar Awal Rozaq | Dev | KID-157 | TTS generator feature added | Feature | Done | 100% |
| 19-Aug-2026 | Kimee | Muhammad Luthfi Rahman | Dev | KID-158 | Kimee deployed to production | Infra/Ops | Done | 100% |
| 19-Aug-2026 | Kimee | Muhammad Luthfi Rahman | Dev | KID-153/ KID-154 | Setting up Stripe for Kimee | Infra/Ops | Done | 100% |
| 19-Aug-2026 | Lulladream | Ni Komang Dwi Maharani | BA | N/A — coordination follow-up (ticket already filed, see infra project) | Follow-up with infra team on the backend staging CMS issue | Infra/Ops | In Progress | 50% |
| 19-Aug-2026 | Lulladream | Ni Komang Dwi Maharani | BA | N/A — administrative (editing existing tickets) | Updated Jira task descriptions with detailed flow explanations | Documentation | Done | 100% |
| 19-Aug-2026 | Lulladream | Ni Komang Dwi Maharani | BA | ABT-672 | Created Jira task for Dimas — APK notification feature | Coordination | Done | 100% |
| 19-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-673 | Updated role & permissions management in CMS | Feature | Done | 100% |
| 19-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-674 | Updated user management in CMS | Feature | Done | 100% |
| 19-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-670 / ABT-671 | Waiting on infra to fix backend staging CMS before env can be checked | Infra/Ops | Blocked | 15% |
| 19-Aug-2026 | Booksnap | Ni Komang Dwi Maharani | BA | N/A — informal check by BA, no dedicated ticket | Testing new updates: sign-out button color, comment popup nav bar, close button icon | QA/Testing | In Progress | 50% |
| 19-Aug-2026 | Booksnap | Gilang Permana Putra | Dev | BN-533 | Updated sign-out button primary color | Feature | Done | 100% |
| 19-Aug-2026 | Booksnap | Gilang Permana Putra | Dev | BN-535 | Implemented comment popup nav bar hide | Feature | Done | 100% |
| 19-Aug-2026 | Booksnap | Gilang Permana Putra | Dev | BN-536 | Added close button icon | Feature | Done | 100% |
| 19-Aug-2026 | SpeakEasy | Ni Komang Dwi Maharani | BA | N/A — meeting/coordination | Meeting with content team on question template | Coordination | Done | 100% |
| 19-Aug-2026 | SpeakEasy | Muhammad Luthfi Rahman | Dev | N/A — meeting/coordination | Explained template usage flow to content team | Coordination | Done | 100% |
| 19-Aug-2026 | Life Fit | Ni Komang Dwi Maharani | BA | N/A — monitoring/waiting, no ticket needed | Monitoring CMS testing from QA | Support/Escalation | Monitoring | 40% |
| 19-Aug-2026 | Life Fit | Achmad Setiadji Nugroho | Dev | LF-198 | Waiting on QA sign-off before deploying to production | Support/Escalation | Monitoring | 40% |
| 19-Aug-2026 | Life Fit | Muhammad Luthfi Rahman | Dev | N/A — monitoring/waiting, no ticket needed | Waiting on QA sign-off before deploying to production | Support/Escalation | Monitoring | 40% |
| 19-Aug-2026 | Life Fit | Indrapati | QA | LF-196 / LF-197 | Finished testing CMS notification flow | QA/Testing | Done | 100% |
| 19-Aug-2026 | Life Fit | Andhika | QA | LF-194 / LF-195 | Started testing APK registration flow (Google SSO & WhatsApp) | QA/Testing | In Progress | 50% |
| 19-Aug-2026 | MinuteX | Dimas Fahrul | Dev | Could not create — no permission on LMA project | Deployed to staging, queued for QA testing (Teams Meeting feature) | Feature | In Progress | 50% |
| 19-Aug-2026 | Fantasy Eleven | Bimo Prakoso Wibowo | BA | N/A — pre-kickoff, no active ticket | No new update — waiting for kickoff, CMS slicing pending | Coordination | Blocked | 15% |
| 19-Aug-2026 | RuangRasa | Ni Komang Dwi Maharani | BA | N/A — infra ticket filed in a separate Infra project | Filed infra ticket to prep RuangRasa environment | Infra/Ops | Done | 100% |
| 19-Aug-2026 | RusVPN | Muhammad Luthfi Rahman | Dev | RVPN-260 | Preparing domain pointing & subdomain for the new landing page | Infra/Ops | In Progress | 50% |
| 20-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | N/A — informal check by BA, no dedicated ticket | Testing report generator | QA/Testing | In Progress | 50% |
| 20-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | N/A — administrative (planning to request from QA) | Rencana minta smoke test Portal & CMS production ke QA besok (Jumat) | Coordination | To Do | 10% |
| 20-Aug-2026 | Kimee | Hasri Akbar Awal Rozaq | Dev | KID-160 | Report generator selesai | Feature | Done | 100% |
| 20-Aug-2026 | Kimee | Muhammad Luthfi Rahman | Dev | N/A — monitoring/waiting, no ticket needed | Menunggu hasil smoke test — belum diminta ke QA | Support/Escalation | Monitoring | 40% |
| 20-Aug-2026 | Lulladream | Ni Komang Dwi Maharani | BA | N/A — infra ticket filed in a separate Infra project | Ticket infra: tambah CORS di backend staging | Infra/Ops | Done | 100% |
| 20-Aug-2026 | Lulladream | Ni Komang Dwi Maharani | BA | N/A — infra ticket filed in a separate Infra project | Ticket infra: issue staging FE portal (sudah solve) | Infra/Ops | Done | 100% |
| 20-Aug-2026 | Lulladream | Ni Komang Dwi Maharani | BA | N/A — infra ticket filed in a separate Infra project | Ticket infra: staging folder upload tidak writable, generate story gagal tersimpan | Infra/Ops | Done | 100% |
| 20-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-675 | Update management List Data Subscriptions (Plan, Package, dll) | Feature | Done | 100% |
| 20-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-676 | Fixing Detail Story Page | Bug Fix | Done | 100% |
| 20-Aug-2026 | Booksnap | Ni Komang Dwi Maharani | BA | N/A — informal check by BA, no dedicated ticket | Selesai testing recommendation chip white fill & audio detail overlay | QA/Testing | Done | 100% |
| 20-Aug-2026 | Booksnap | Gilang Permana Putra | Dev | BN-537 | Recommendation chip white fill ditambahkan | Feature | Done | 100% |
| 20-Aug-2026 | Booksnap | Gilang Permana Putra | Dev | BN-538 | Audio detail overlay ditambahkan | Feature | Done | 100% |
| 20-Aug-2026 | SpeakEasy | Ni Komang Dwi Maharani | BA | N/A — monitoring/waiting, no ticket needed | Monitoring & maintenance, menunggu feedback user/team content | Support/Escalation | Monitoring | 40% |
| 20-Aug-2026 | SpeakEasy | Muhammad Luthfi Rahman | Dev | N/A — monitoring/waiting, no ticket needed | Monitoring & maintenance, menunggu feedback user/team content | Support/Escalation | Monitoring | 40% |
| 20-Aug-2026 | Life Fit | Ni Komang Dwi Maharani | BA | N/A — informal check by BA, no dedicated ticket | Selesai testing CMS staging — ada bug, sudah info ke Aji | QA/Testing | Done | 100% |
| 20-Aug-2026 | Life Fit | Achmad Setiadji Nugroho | Dev | LF-202 | Fixing staging CMS supaya fungsi create jalan (bug dari testing Rani) | Bug Fix | In Progress | 50% |
| 20-Aug-2026 | Life Fit | Achmad Setiadji Nugroho | Dev | N/A — informal check, no dedicated ticket | Pengecekan & push notification di staging | QA/Testing | In Progress | 50% |
| 20-Aug-2026 | Life Fit | Muhammad Luthfi Rahman | Dev | LF-205 | Mulai menyesuaikan fitur notifikasi dari Portal ke APK | Feature | In Progress | 50% |
| 20-Aug-2026 | Life Fit | Andhika | QA | LF-194 / LF-195 | Selesai testing flow registrasi APK (Google SSO & WhatsApp Link) | QA/Testing | Done | 100% |
| 20-Aug-2026 | MinuteX | Bimo Prakoso Wibowo | BA | N/A — monitoring/waiting, no ticket needed | Monitoring progress fitur Teams Meeting | Support/Escalation | Monitoring | 40% |
| 20-Aug-2026 | MinuteX | Dimas Fahrul | Dev | Could not create — no permission on LMA project | Deploy ke staging, antri QA testing (fitur Teams Meeting) | Feature | In Progress | 50% |
| 20-Aug-2026 | Fantasy Eleven | Bimo Prakoso Wibowo | BA | N/A — pre-kickoff, no active ticket | Tidak ada update baru — masih menunggu kickoff | Coordination | Blocked | 15% |
| 20-Aug-2026 | Fantasy Eleven | Gilang Permana Putra | Dev | N/A — pre-kickoff, no active ticket | Dev team dikonfirmasi, menunggu kickoff untuk mulai | Coordination | Monitoring | 40% |
| 20-Aug-2026 | RuangRasa | Ni Komang Dwi Maharani | BA | N/A — meeting/coordination | Meeting tim bahas AI Engine | Coordination | Done | 100% |
| 20-Aug-2026 | RuangRasa | Muhammad Affan Ilhamsyah | BA | N/A — meeting/coordination | BA khusus AI engine — meeting tim bahas AI Engine | Coordination | Done | 100% |
| 20-Aug-2026 | RuangRasa | Hasri Akbar Awal Rozaq | Dev | N/A — meeting/coordination | Dev lead AI engine — meeting tim bahas AI Engine | Coordination | Done | 100% |
| 20-Aug-2026 | RuangRasa | Yafi | Dev | N/A — tentative, no ticket needed yet | Kemungkinan bantu build AI engine (belum pasti) | Coordination | To Do | 10% |
| 20-Aug-2026 | RusVPN | Silla | BA | N/A — meeting/coordination | Meeting knowledge-transfer — handover ke Rani dimulai | Coordination | Done | 100% |
| 20-Aug-2026 | RusVPN | Ni Komang Dwi Maharani | BA | N/A — meeting/coordination | Meeting knowledge-transfer — ambil alih dari Silla | Coordination | Done | 100% |
| 20-Aug-2026 | RusVPN | Muhammad Luthfi Rahman | Dev | N/A — meeting/coordination | Meeting knowledge-transfer | Coordination | Done | 100% |
| 20-Aug-2026 | Fantasy Eleven | Farhan | Dev | N/A — pre-kickoff, no active ticket | Dev team dikonfirmasi, menunggu kickoff untuk mulai | Coordination | Monitoring | 40% |
| 20-Aug-2026 | Fantasy Eleven | Yafi | Dev | N/A — pre-kickoff, no active ticket | Dev team dikonfirmasi, menunggu kickoff untuk mulai | Coordination | Monitoring | 40% |
| 21-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | N/A — informal check by BA, no dedicated ticket | Testing chatbot | QA/Testing | Done | 100% |
| 21-Aug-2026 | Kimee | Ni Komang Dwi Maharani | BA | KID-161 | Membuat task Jira untuk QA smoke test Portal | Coordination | Done | 100% |
| 21-Aug-2026 | Kimee | Hasri Akbar Awal Rozaq | Dev | KID-163 | Fitur chatbot selesai | Feature | Done | 100% |
| 21-Aug-2026 | Kimee | Luthfi Rahman | Dev | N/A — monitoring/waiting, no ticket needed | Menunggu hasil smoke test dari QA | Support/Escalation | Monitoring | 40% |
| 21-Aug-2026 | Kimee | Indrapati | QA | KID-161 | Mulai smoke test Portal Kimee | QA/Testing | In Progress | 50% |
| 21-Aug-2026 | Lulladream | Ni Komang Dwi Maharani | BA | N/A — infra ticket filed in a separate Infra project | Reply ticket infra: tambah subdomain Lulladream di ticket CORS | Infra/Ops | Done | 100% |
| 21-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-677 | Fixing currency berdasarkan bahasa user yang dipilih | Bug Fix | Done | 100% |
| 21-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-678 | Update menu Subscription (plan, coins & active user) | Feature | Done | 100% |
| 21-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-679 | Fixing generate story | Bug Fix | Done | 100% |
| 21-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-680 | Manage Subscription page i18n | Feature | Done | 100% |
| 21-Aug-2026 | Lulladream | Aldiama Hari Octavian | Dev | ABT-681 | Fitur onboarding "Try for Free" i18n | Feature | Done | 100% |
| 21-Aug-2026 | Booksnap | Ni Komang Dwi Maharani | BA | N/A — informal check by BA, no dedicated ticket | Selesai testing top navbar, sign-out & icon overlay | QA/Testing | Done | 100% |
| 21-Aug-2026 | Booksnap | Gilang Permana Putra | Dev | BN-539 | Hide top nav on scroll ditambahkan | Feature | Done | 100% |
| 21-Aug-2026 | Booksnap | Gilang Permana Putra | Dev | BN-540 | Sign-out popup design di-update | Feature | Done | 100% |
| 21-Aug-2026 | Booksnap | Gilang Permana Putra | Dev | BN-541 | Swipe icon overlay ditambahkan | Feature | Done | 100% |
| 21-Aug-2026 | SpeakEasy | Ni Komang Dwi Maharani | BA | N/A — monitoring/waiting, no ticket needed | Monitoring & maintenance, menunggu feedback user/team content | Support/Escalation | Monitoring | 40% |
| 21-Aug-2026 | SpeakEasy | Muhammad Luthfi Rahman | Dev | N/A — monitoring/waiting, no ticket needed | Monitoring & maintenance, menunggu feedback user/team content | Support/Escalation | Monitoring | 40% |
| 21-Aug-2026 | Life Fit | Ni Komang Dwi Maharani | BA | N/A — administrative (created ticket(s) in LF project, see LF-199/200/201) | Membuat task Jira untuk temuan bug hasil test QA (CMS & APK) | Coordination | Done | 100% |
| 21-Aug-2026 | Life Fit | Achmad Setiadji Nugroho | Dev | LF-207 | Pengecekan & push notification di staging | QA/Testing | In Progress | 50% |
| 21-Aug-2026 | Life Fit | Achmad Setiadji Nugroho | Dev | LF-208 | Staging server belum ada worker kirim notif — info ke tim infra | Infra/Ops | Blocked | 15% |
| 21-Aug-2026 | Life Fit | Muhammad Luthfi Rahman | Dev | N/A — monitoring/waiting, no ticket needed | Menunggu update server staging dari infra sebelum lanjut fitur notif APK | Support/Escalation | Monitoring | 40% |
| 21-Aug-2026 | Life Fit | Muhammad Luthfi Rahman | Dev | LF-199 | Mulai mengerjakan bug session lost setelah reopen | Bug Fix | In Progress | 50% |
| 21-Aug-2026 | MinuteX | Bimo Prakoso Wibowo | BA | N/A — monitoring/waiting, no ticket needed | Monitoring progress fitur Teams Meeting | Support/Escalation | Monitoring | 40% |
| 21-Aug-2026 | MinuteX | Dimas Fahrul | Dev | Could not create — no permission on LMA project | Deploy ke staging, antri QA testing (fitur Teams Meeting) | Feature | In Progress | 50% |
| 21-Aug-2026 | Fantasy Eleven | Bimo Prakoso Wibowo | BA | N/A — pre-kickoff, no active ticket | Tidak ada update baru — masih menunggu kickoff | Coordination | Blocked | 15% |
| 21-Aug-2026 | Fantasy Eleven | Gilang Permana Putra | Dev | N/A — pre-kickoff, no active ticket | Dev team dikonfirmasi, menunggu kickoff untuk mulai | Coordination | Monitoring | 40% |
| 21-Aug-2026 | Fantasy Eleven | Farhan | Dev | N/A — pre-kickoff, no active ticket | Dev team dikonfirmasi, menunggu kickoff untuk mulai | Coordination | Monitoring | 40% |
| 21-Aug-2026 | Fantasy Eleven | Yafi | Dev | N/A — pre-kickoff, no active ticket | Dev team dikonfirmasi, menunggu kickoff untuk mulai | Coordination | Monitoring | 40% |
| 21-Aug-2026 | RuangRasa | Ni Komang Dwi Maharani | BA | N/A — coordination (reviewing PRD, not yet ticketed work) | Memahami PRD yang diberikan tim Product | Coordination | In Progress | 50% |
| 21-Aug-2026 | RuangRasa | Hasri Akbar Awal Rozaq | Dev | N/A — coordination (reviewing PRD, not yet ticketed work) | Memahami PRD yang diberikan tim Product | Coordination | In Progress | 50% |
| 21-Aug-2026 | RusVPN | Silla | BA | N/A — monitoring/waiting, no ticket needed | Menunggu tim Product untuk design final CMS Phase 2 | Support/Escalation | Monitoring | 40% |
| 21-Aug-2026 | RusVPN | Ni Komang Dwi Maharani | BA | N/A — monitoring/waiting, no ticket needed | Menunggu tim Product untuk design final CMS Phase 2 | Support/Escalation | Monitoring | 40% |
| 20-Aug-2026 | HRIS CCTV Attendance | Muhammad Mishbakhuz Zuhail | Dev | RNDS-868 | Migrate Photo Database from Google Drive to Supabase | Support/Escalation | Done | 100% |
| 20-Aug-2026 | HRIS CCTV Attendance | Muhammad Mishbakhuz Zuhail | Dev | RNDS-869 | Implement and Test FIFO Photo Storage (10 Photos per Employee) | Support/Escalation | Done | 100% |
| 20-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-891 | Build Login Page for Vendissimo | Feature | Done | 100% |
| 20-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-892 | Build Dashboard Page with Dark Mode and Notification System | Feature | Done | 100% |
| 20-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-893 | Build Machine Page | Feature | Done | 100% |
| 20-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-894 | Build Sales Report Page | Feature | Done | 100% |
| 20-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-895 | Build Stock Management Page | Feature | Done | 100% |
| 20-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-902 | Build Login Backend and API | Feature | Done | 100% |
| 20-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-903 | Build Dashboard Page Backend and API | Feature | Done | 100% |
| 20-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-904 | Build Machine Backend and API | Feature | Done | 100% |
| 20-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-905 | Build Sales Backend and API | Feature | Done | 100% |
| 20-Aug-2026 | Dalang Dev Infrastructure | Muhammad Rifal Alfarizy | Dev | RNDS-876 | Troubleshoot and Fix Disk Write Spike on Dalang Dev | Support/Escalation | Done | 100% |
| 20-Aug-2026 | Dalang Dev Infrastructure | Muhammad Rifal Alfarizy | Dev | RNDS-877 | Troubleshoot Database Airtime | Support/Escalation | Done | 100% |
| 20-Aug-2026 | Dalang Dev Infrastructure | Muhammad Rifal Alfarizy | Dev | RNDS-878 | Troubleshoot and Fix Swap Memory Issue on Dalang Dev | Support/Escalation | Done | 100% |
| 20-Aug-2026 | Dalang Dev Infrastructure | Muhammad Rifal Alfarizy | Dev | RNDS-879 | Troubleshoot Dalang Dev PostgreSQL Connection via AI Factory | Support/Escalation | Done | 100% |
| 20-Aug-2026 | PPOB CS Chatbot | Yaafi Asyari | Dev | RNDS-880 | PPOB CS Prompt Scoring Push to 90 | Feature | Done | 100% |
| 20-Aug-2026 | AI Creative Tools | Yaafi Asyari | Dev | RNDS-881 | Creative Tools Banner Generation Development | Feature | Done | 100% |
| 21-Aug-2026 | HRIS CCTV Attendance | Muhammad Mishbakhuz Zuhail | Dev | RNDS-870 | Pull Vendissimo CCTV Data for Dataset Completion | Support/Escalation | Done | 100% |
| 21-Aug-2026 | HRIS CCTV Attendance | Muhammad Mishbakhuz Zuhail | Dev | RNDS-889 | HRIS to CCTV Absences Backend API Integration | Support/Escalation | Monitoring | 90% |
| 21-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-896 | Build Trucking Mapping Tracker Page (Coming Soon Mock Only) | Feature | Done | 100% |
| 21-Aug-2026 | CCTV Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-897 | Build CCTV Dashboard Page | Feature | Done | 100% |
| 21-Aug-2026 | CCTV Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-898 | Build CCTV Traffic System Page | Feature | Done | 100% |
| 21-Aug-2026 | CCTV Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-899 | Build CCTV Analytics System Page | Feature | Done | 100% |
| 21-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-900 | Build User Management Page | Feature | Done | 100% |
| 21-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-906 | Build Stock Backend and API | Feature | Monitoring | 50% |
| 21-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-907 | Build Trucking Mapping Tracker Backend (Coming Soon Mock Only) | Feature | Done | 100% |
| 21-Aug-2026 | Vendissimo | Muhammad Affan Ilhamsyah | BA | RNDS-908 | Build User Management Backend and API | Feature | Done | 100% |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1820 | Requirement API & Business Flow | Documentation | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Budi Setio Nugroho | Dev | IV-1821 | Profile - Setup Subscribe LP If User Not Subscribed | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | ilham.nadhif | Dev | IV-1822 | Preparing Server Integration | Infra/Ops | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1823 | Cloning Portal Speakeasy | Infra/Ops | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Budi Setio Nugroho | Dev | IV-1824 | Portal / LP - Setup TnC | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1825 | Testing Subscribe | QA/Testing | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1826 | Setup Domain Portal | Infra/Ops | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Budi Setio Nugroho | Dev | IV-1827 | Setup Content Portal (Game, Language) | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | ilham.nadhif | Dev | IV-1828 | Create Notification URL | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1829 | Input Data Requirement to Checklist | Documentation | To Do | 0% |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1830 | Testing End to End (SIT) | QA/Testing | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1831 | Register Data to Fery | Coordination | To Do | 0% |
| 24-Aug-2026 | Booksnap (Singtel SG) | Indrapati | QA | IV-1832 | Testing CMS | QA/Testing | Done | 100% |
| 24-Aug-2026 | Booksnap (Singtel SG) | Synatria Subekti | Dev | IV-1833 | Implement Landing Page | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Budi Setio Nugroho | Dev | IV-1834 | Create Auto login mssidn Portal | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Budi Setio Nugroho | Dev | IV-1835 | Profile - Update Label Subscribe & Next Renewal | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | ilham.nadhif | Dev | IV-1836 | Implement API Send OTP | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1837 | UAT with Telco | QA/Testing | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1838 | Preparing Design LP | Documentation | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | ilham.nadhif | Dev | IV-1839 | Implement API OTP Verification | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1840 | Implement to Wakiads | Coordination | To Do | 0% |
| 24-Aug-2026 | Booksnap (Singtel SG) | ilham.nadhif | Dev | IV-1841 | Implement API Unsubscribe | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Budi Setio Nugroho | Dev | IV-1842 | Update Portal Using Local Language Poland | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Budi Setio Nugroho | Dev | IV-1843 | Profile - Setup Unsubscribe API / LP | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1844 | Input service catalogue | Documentation | To Do | 0% |
| 24-Aug-2026 | Booksnap (Singtel SG) | Budi Setio Nugroho | Dev | IV-1845 | Hide booster page - Poland Speakeasy (Orange | Plus | Play | T-Mobile) | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1846 | Checking content not available in some languages - Poland Speakeasy (Orange | Plus | Play | T-Mobile) | QA/Testing | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | ilham.nadhif | Dev | IV-1847 | Adjustment Landing Page - Feedback from Telco | Feature | In Progress | |
| 24-Aug-2026 | Booksnap (Singtel SG) | Luthfi Kiransyah | BA | IV-1848 | Testing Portal | QA/Testing | Done | 100% |